ISO 19650 · Buildings and infrastructure

From client requirements to operational decisions.

Corridata turns the client's EIR and the BEP into automatic checks on every model. The same asset data then moves through coordination and handover into a live digital twin, where it supports maintenance and investment decisions.

Rules from the EIR and BEPMEP and infrastructure assetsHandover you can audit
Demo · 3 min 29 s · English narrationSamples: Autodesk Snowdon Towers (IFC4) · buildingSMART infrastructure (IFC 4.3)
The problem

Information gets lost between the brief and the building.

Requirements stay in PDFs

The EIR and BEP are written once, then checked by hand. Nobody can say, at any moment, which requirements a model meets.

Clashes are reviewed one by one

Hundreds of MEP clashes reach the meeting as a flat list, with no cause, no owner and no rule for who moves.

Handover data arrives late

Asset data is collected at the end, incomplete and inconsistent, so the facility team starts operation without a reliable record.

Who it is for

Each team uses the part of the chain it is responsible for.

Corridata is modular. Designers and contractors use it to deliver compliant information. Owners use the same data to run their assets.

Engineering & BIM consultancies

Faster coordination, deliverables that pass

  • Clash matrix and clearance rules taken from the BEP
  • Clashes grouped by cause, with a clear rule for who moves
  • IDS checks before every submission, so models are not rejected
  • An AIM ready for the client's digital twin, as a service they can bill
RequirementsCoordinationIDS checksHandover
Contractors

Proof of compliance, a handover without rework

  • Evidence that each model meets the client's information requirements
  • WBS on every element for 4D sequencing and 5D quantities
  • A handover gate that shows which asset still lacks which data, and who owes it
  • No late, manual data collection at the end of the job
4D / 5DIDS checksHandover gate
Owners & operators

Reliable asset data from day one

  • An asset register that loads into the CMMS and GIS
  • KPIs for each stakeholder, from operator to owner
  • Forecasts of when an asset will cross its limit
  • Maintenance decisions ranked by criticality and urgency
Asset databaseDecision twinGIS export
Time

Checks that take a coordinator days run in minutes, on every model, every round.

Risk

Missing data and clashes are found during design, while they are still cheap to fix.

Compliance

Every check traces back to a clause of the EIR or the BEP, so the result can be shown to the client.

Continuity

The same Asset ID follows each element from the design model to the work order.

€2M
Why now

Since 1 January 2025, BIM is mandatory in Italy for new public works and interventions on existing works above €2 million (D.Lgs. 36/2023, art. 43, as amended by D.Lgs. 209/2024). Clients must define their information requirements, and every supplier must show that its models meet them. That check is what Corridata automates.

How it works

One information chain, checked at every step.

Every check in Corridata traces back to a client requirement. The same Asset ID follows the element from the design model to the work order.

OIROrganisationWhat the client needs to run the business
AIRAssetsData needed for each asset type
PIRProjectWhat the project must answer
EIRExchangeFields, stages and owners per delivery
BEPExecutionRules, clash matrix, WBS, naming
PIMProject modelFederated IFC, checked with IDS
AIMAsset modelApproved asset records at handover
TwinOperationLive data, KPIs, predictions, decisions
RequirementsDeliveryHandoverOperation
Buildings and infrastructure

The same rules engine for a building and for a bridge.

The rules are written per project, not per software or per sector. Both demos below run on the same platform.

Sample building with its five discipline models federated: structure, architecture, HVAC, plumbing and electrical
Buildings · IFC4

MEP-heavy buildings and data centres

  • 5 disciplines federated, 19,636 elements checked
  • Revit add-in writes asset IDs, classification and WBS
  • Clash matrix with clearance rules for MEP
  • Power chain and single points of failure
Sample: Autodesk Snowdon Towers
Infrastructure sample with a road bridge, a railway bridge, road, drainage and landscape
Infrastructure · IFC 4.3

Bridges, roads, railways and utilities

  • 6 IFC 4.3 models: bridges, road, railway, drainage, EV charging, signs
  • 95 assets identified by IFC class, with projected coordinates
  • Asset register exported to GeoJSON for QGIS and ArcGIS
  • Found 4 elements duplicated across models, and clearance issues between signs and rails
Sample: buildingSMART International IFC 4.3, CC BY 4.0
Platform

Six modules on one rules engine.

Requirements

The EIR becomes asset information requirements, each with a stage (design, construction, handover), an owner and its source clause.

CDM_AssetID · required at stage H

Coordination

The BEP becomes a clash matrix with clearance rules and a clear order of who moves. Clashes are grouped by cause, so one group needs one decision.

ME vs ST · 50 mm · ME moves

Information checks

Every IFC4 model is checked against IDS rules generated from the EIR. Results point to the exact element and the missing field.

IfcFlowTerminal · Uniformat D3040

4D and 5D

A WBS code is written on every element in Revit. It drives the Navisworks TimeLiner sequence and quantities per activity.

WBS L02.ME.DCT

Handover gate

A single gate shows which asset is missing which data, who must deliver it, and when the model is ready to release to the asset database.

AIM 61% · not ready

Operations twin

The same Asset IDs receive building data. KPIs, predictions and ranked decisions turn into work orders that update the asset record.

WO-0001 → CDM_LastMaintenance
MEP first

Built for the disciplines that carry the assets.

Most maintainable assets, systems and handover data sit in the MEP models. Corridata federates all five disciplines, then puts mechanical, plumbing and electrical systems at the centre of coordination and handover.

For data centres and critical facilities, it traces the power chain and flags single points of failure.

5disciplines federated in IFC4
19,636elements checked in the sample
13asset fields from the EIR
Sample building with structure and architecture shown as glass and the MEP systems in full colour
MEP focus: structure and architecture as glass, ducts, pipes and equipment in full colour.
Decision twin

From live data to the next maintenance decision.

The twin does more than display sensors. It shows each stakeholder their own indicators, forecasts when an asset will cross its limit, and ranks what to do first.

KPIs per stakeholder

Operator, facility manager and owner each see the indicators they act on.

99.97%asset availability
open work orders
−8%energy vs target

Prediction

Trends become forecasts. Transformer T1 reaches its alarm limit in about 12 days.

Ranked decisions

Ranked by criticality and urgency. One click creates the work order.

Transformer T1critical · ~12 days
AHU-02 filterhigh · ~20 days
UPS-01 battery testplanned

Operational values on this page come from a simulated building-management feed on the sample model.

Open standards

One rules engine, any authoring tool.

The rules do not depend on the software. Each tool connects through open standards, so new tools plug into the same checks.

Design & authoring

  • Revitadd-in
  • Civil 3Dvia IFC 4.3
  • Tekla · Archicadvia IFC

Coordination & CDE

  • Navisworksfile
  • Autodesk ACCplanned
  • Solibri · BIMcollabvia BCF

Infrastructure & GIS

  • IFC 4.3tested
  • GeoJSON exportfile
  • QGIS · ArcGISvia GeoJSON

Operation

  • BMS · IoT gatewaysimulated
  • CMMS work orderssimulated
  • Power BIexport
ISO 19650IFC4IFC 4.3IDSBCFCOBieUniformat IIBACnet · Modbus · MQTT
Status

Working prototype, tested on a building and on an infrastructure scene.

NowPrototype

  • Rules engine from EIR and BEP
  • Revit add-in for parameters, WBS, IFC export
  • IFC4 and IFC 4.3 federation, IDS checks, clash matrix
  • Infrastructure assets and GIS export
  • Handover gate and asset database

NextPilot

  • Autodesk ACC connection
  • Large-model streaming viewer
  • BCF and COBie exchange
  • First pilot projects

LaterScale

  • Alignments and chainage for linear assets
  • Direct Civil 3D connection
  • Live BMS and IoT gateways
  • Predictive maintenance models
Early access

Bring Corridata to your next project.

We are looking for pilot projects with engineering firms, contractors and owners: MEP-heavy buildings, data centres and infrastructure. Tell us about your project and we will show you the platform on your own models.